I’ve never ever undertaken this operate but I’d picture you would wish to bridge the STA (Starter Sign Wire) plus the NSW (Neutral Start Change) to the auto transmission loom to your B+ 12v resource source from memory.Employed engine warranties are limited due to external components further than our control. These would include working with anc